A Fluke test protocol can be recorded in a job plan and in an equipment type in Ultimo. This also makes it possible to generate periodical jobs for it. The job screen contains a button to start Fluke OneQA.

The test can then be performed in OneQA. When the test is complete, the results are returned to Ultimo. All the steps from the test are added as separate inspection items under the job with the corresponding result.

With this integration the tests can be managed easily and the results are centrally saved with the corresponding instrument.

It is also possible to generate a measurement report to demonstrate that the tests in question have been performed for the device.

More information

If you would like more information, please don’t hesitate to contact us on sales@ultimo.com or contact your account manager.

Andra bloggar skrivna av Freddy Vos

Vi står till din tjänst
Freddy Vos VP International Sales
freddy.vos@ultimo.com
+31 341 42 37 37